
GE Oil & Gas Wins US$500 Million Petrobras Contract
15 January 2013
GE
Oil & Gas has won a contract worth more than US$500 million to
supply turbo machinery equipment and services to Petrobras, a world leader in
deep-water oil production. The contract will serve the four new floating
production, storage and offloading units (FPSOs P-74, P-75, P-76 and P-77) in
the Cessão Onerosa region of the Santos Basin pre-salt fields, in the state of
São Paulo.
"Our focus is to seek partnerships like this, where GE can offer its expertise
to support the economic development of Brazil,” said Reinaldo Garcia, president
and CEO of GE Latin America. "The country continues to assume an increasingly
strategic position to the company's business globally, and Petrobras is one of
the most important partners we have.”
The main benefits of GE’s proposal include an aggressive delivery
cycle, high equipment reliability and efficiency, improved performance,
emissions control and extended equipment life. In the pre-salt fields, GE’s
technology will face some of the most challenging conditions.
"This contract with Petrobras demonstrates GE’s technological offshore
leadership and our capacity to face our clients’ most difficult challenges,”
says João Geraldo Ferreira, president and CEO of GE Oil & Gas for Latin
America. "This win was the result of the collaboration between the different
product and business lines at GE, demonstrating the strength of the company’s
integration.”
GE Oil & Gas will supply the main turbomachinery equipment to the four new
FPSOs. The technology will generate primary energy for the FPSOs using gas
turbines and advanced generators, moving gas through pipelines using
compressors and re-injecting CO2 and natural gas back to the well to
enhance the recovery of the oil. The scope of supply, which also takes in
technology from other GE businesses, such as Power Conversion and Power &
Water, includes:
- 16 powergen turbo generators composed of PGT25+ gas turbines and electric generators.
- Eight turbo compression trains driven by LM2500+ gas turbines.
- 32 electric motor driven compressors for gas main, export services and CO2 re-injection.
In addition to core equipment, the new contract includes technical assistance for installation and commissioning start-up and extensive services, such as repair, dedicated local field service engineers and customer training. As with previous major Petrobras contracts, significant local components will be involved. Packaging, testing, logistics and sourcing operations will be some of the stages carried out entirely in Brazil. The installations where these operations will be held will start being prepared at the beginning of this year. GE also will carry out training to supply the necessary competencies to operate and maintain the equipment. Training will cover 9,600 man-hours.